JANIN ATLAS,
a subsidiary of VINCI Construction Grands Projets, part of the VINCI Group, construction worldwide leader, specialized in the design and construction of major civil engineering and building works in Canada is hiring an
Health & Safety Coordinator
What is the project?
The Pickering Nuclear Generating Station refurbishment program involves designing and building a new deep-water intake in Lake Ontario to improve the plant's cooling system. This will involve:
A5 km-long tunnel, built by a pressurized TBM (10.15 m diameter slurry TBM);
Two vertical shafts (onshore and offshore);
An offshore modular intake structure, resting on the lake bed.
The project is distinguished by its proximity to an active nuclear site, requiring rigorous standards of safety, planning and coordination.
What you will do:
Ensure the implementation and monitoring of health and safety standards across all phases of the project, guaranteeing compliance with local regulations, corporate policies, and nuclear site requirements.
Concretely, your tasks will be:
Develop, implement, and maintain the Health & Safety Management Plan for the project;
Conduct risk assessments and hazard analyses for tunneling, shaft construction, and offshore works;
Monitor compliance with safety procedures and legal requirements on-site;
Coordinate safety training programs for all personnel and subcontractors;
Lead incident investigations and implement corrective actions;
Liaise with project management, engineering teams, and client representatives to ensure safety integration in planning and execution;
Prepare and present regular safety reports and KPIs to management;
Ensure emergency preparedness and response plans are in place and tested.
Your skills:
Bachelor’s Degree in Health, Safety & Environment (HSE), Risk Management, Industrial Hygiene, or Engineering
Minimum 6 years of experience in Health & Safety roles on large infrastructure projects;
Proven experience in tunneling or underground works, preferably with TBM operations;
Experience working on projects with high-risk environments (nuclear, offshore, or similar);
Proficiency in MS Office Suite (Excel, Word, PowerPoint);
Familiarity with safety management systems and incident reporting tools;
Strong leadership and communication skills;
Exhibit strong time management skills;
High attention to detail and proactive approach to problem-solving;
Demonstrate practical knowledge of current health and safety legislation.
What do we have to provide:
4 vacation weeks & 3 emergency/sickness days paid;
Annual bonuses;
Group Health Insurance (premium participation including virtual health care system);
Wellness spending account;
Monthly public transportation participation;
Career development opportunities;
A cosmopolite and inclusive work environment;
Attractive and challenging project.
About Janin Atlas:
Subsidiary of the VINCI Group, Janin Atlas is involved in large-scale construction and civil engineering projects in Canada. The headquarter of Janin Atlas is based in Montréal, Québec. We are currently involved in three major construction projects in Ontario valued at several billion Canadian dollars.
The construction of the subway line south in Toronto, involving a six-kilometer tunnel and associated excavation work. The project includes the design, construction, and handover of all tunnels (twin tubes of 6 km each), 7 stations (turnkey for: 1 at-grade station and 6 underground stations) and civil engineering works.
Extension of the Confederation Line in Ottawa, one of the components of Phase 2 of the city's O-Train system, which includes the design, construction, and financing of 27.5 km of light rail infrastructure. The work also includes 4 kilometers of cut-and-cover tunnels, 20 engineering structures, 16 stations and a light maintenance facility.
The Pickering Nuclear Generating Station refurbishment program includes the design and construction of a new deep water intake in Lake Ontario to improve the plant's cooling system. This project will include a 1.5 km long tunnel, excavated by a pressurized tunnel boring machine (10.15 m diameter slurry), two vertical shafts (onshore and offshore), and a modular offshore intake structure, resting on the lakebed. This project is notable for its proximity to an active nuclear site, requiring rigorous standards of safety, planning, and coordination.
At Janin Atlas, we believe that diversity is a source of wealth and strength. We are committed to creating an inclusive working environment where every individual is valued and respected. We strongly encourage applications from members of Aboriginal communities and strive to ensure fair and respectful employment opportunities. We recognise the unique contributions of indigenous peoples and are committed to supporting their professional development. By joining our team, you will be part of a company that celebrates diversity and actively works to promote inclusion.